How to open a restaurant in Dubai: the 2026 approvals roadmap
How to open a restaurant in Dubai in 2026: the licence and approval steps in order, Dubai Municipality's shisha café rules, VAT, and who to hire.
Knowing how to open a restaurant in Dubai is mostly about doing things in the right order. Most delays come from signing a lease on a unit that can't take a kitchen, or starting fit-out before the layout is approved. This guide sets out the approvals in order, the extra Dubai Municipality rules if you plan to serve shisha, and the team you'll need to open.
Short answer: on the Dubai mainland, get DET initial approval and a trade name, sign and register an Ejari lease, get your kitchen layout approved by Dubai Municipality before fit-out, collect the trade licence with any other approvals (such as Civil Defence), then pass the Dubai Municipality inspection and apply for the food permit. Shisha needs its own permit, and its siting rules are strict: at least 150 m from homes and schools and 100 m from places of worship.
General information, not legal advice. Confirm each step with DET, Dubai Municipality and Dubai Civil Defence before you sign a lease or pay a contractor.
Mainland or free zone: which licence do you need?
On the mainland, the Dubai Department of Economy and Tourism (DET) handles registration and licensing. A free zone has its own rules and authority. The steps below follow the mainland route; in a free zone, ask that authority what changes.
What are the steps to open a restaurant in Dubai, in order?
- Choose the activity and legal form. Restaurant, café, cafeteria and cloud kitchen can be different activities. Describe what you will actually do: dine-in, takeaway, delivery or all three.
- Get DET initial approval and reserve the trade name. Initial approval means you can move to the next step, such as securing premises. It does not let you trade yet.
- Secure premises and register the lease with Ejari. Before you sign, check the unit can legally take a kitchen: extraction, drainage, gas and floor area all matter. If you want shisha, check the siting rules below first.
- Get your design layout approved by Dubai Municipality. Apply on dm.gov.ae (UAE PASS log-in) for "Approval of design layout for food establishments". Do this before construction starts.
- Collect the trade licence with any other approvals. DET issues the licence once you submit the initial-approval receipt, the memorandum of association (where your legal form needs one) and any approvals other authorities require. For a restaurant, fire and life safety (Dubai Civil Defence) is the obvious one.
- Pass the Dubai Municipality inspection, then apply for the food permit. Dubai Municipality says an establishment can apply for a food permit once it has been inspected and graded A, B or C.
- Apply for a shisha permit, only if you will serve shisha. It has its own conditions (next section).
- Register for VAT when you hit the threshold. See the VAT section below.
What does Dubai Municipality need from a new restaurant?
Dubai Municipality covers the food side. Since 20 December 2024, food permit applications go through the main dm.gov.ae platform rather than the old FoodWatch portal. Its services include layout approval, event, food truck and kiosk permits, and non-halal food permits. All food establishments, including kiosks and food trucks, must also be registered on FoodWatch, with a named person in charge.
Why does layout approval come before fit-out?
The municipality checks your kitchen, storage and washing areas on paper first. Build first and fail, and you rebuild. Have your fit-out contractor submit the drawings before any work starts.
How do you open a shisha café in Dubai?
Serving shisha needs a separate Dubai Municipality permit. The conditions are in its technical guide for smoking-place permits (DM-HSD-GU70-PIGSA1, issue 5, 13 August 2026, in Arabic). Check them before you sign a lease: the location rules alone rule out many units.
Where can a shisha café be located?
- At least 150 m from residential buildings or residential neighbourhoods.
- At least 150 m from the outer entrance of nurseries, schools, institutes, colleges and universities.
- At least 100 m from places of worship.
- In areas zoned commercial, tourist or commercial-residential on approved main roads, or on main roads separating commercial and residential areas.
- At least 7.5 m from the main entrances of neighbouring buildings or shops, and in a building next to public parking or in an area without a parking problem.
- The building owner (or the authority responsible) must approve shisha service in the unit.
- A minimum shop area of 200 m², with an indoor hall of at least 150 m², not counting shared or outdoor areas.
What operating rules apply to shisha service?
- Tobacco service hours are 10 AM to 12 midnight. They can be extended with a special permit.
- For restaurants, the shisha area can be no more than 50% of the indoor dining area and 50% of the outdoor area.
- No shisha inside cabins enclosed on three or more sides.
- An emergency exit with signage is needed if the venue seats more than 50.
- Coal must be stored safely, and used coal must go in non-flammable containers at least 3 m from anything flammable.
- Staff who prepare or serve shisha can't do any other job in the venue, and they need a dedicated uniform.
If you'd rather not run shisha in-house, there are shisha service and consultancy teams on Kattegat's Dubai shisha page. You still need the venue permit.
How much does it cost to open a restaurant in Dubai?
There's no single reliable figure, and we won't invent one. Licence fees depend on the activity and legal form; DET shows the exact amount on your payment voucher. The big costs are the lease, fit-out and kitchen equipment, staff and visas, and launch marketing. Get written quotes before you sign. For example, Kattegat Vetted restaurant listings on 25 November 2026 started from AED 7,100 for a restaurant website build and from AED 5,400 for a 30-day Meta ads campaign.
When does a new restaurant have to register for VAT?
The Federal Tax Authority sets the mandatory registration threshold at AED 375,000. You must register once your taxable supplies and imports have gone over that amount in the previous 12 months, or when you expect to go over it in the next 30 days. You can register voluntarily above AED 187,500. A busy restaurant can pass it within months, so track sales from day one.
Who do you need on your opening team?
Kattegat had these Dubai sellers live on 25 November 2026:
- Restaurant consultancy: 24 consultants for concept, menu, operations and guest experience.
- Fit-out: 11 fit-out and venue specialists.
- Shisha: 23 shisha service teams.
- Marketing: 13 marketing specialists for launches, content and ads.
- Entertainment: DJs, singers and bands for your opening night and your weekly line-up. Read our guides on DJ booking agreements and booking a resident singer.
You can browse and message sellers directly, or post a requirement and let them come to you. Direct bookings with Pro sellers have 0% commission. Kattegat Vetted is a separate paid, fully managed booking service.
What should you check before you sign a lease?
Check the unit can take a commercial kitchen (extraction, drainage, gas, grease trap), meets the shisha rules above if you want shisha, and that the landlord allows your activity. Agree who handles the Civil Defence and municipality drawings, and ask for a rent-free fit-out period that covers realistic approval times.
Sources: dubai.ae; Dubai Municipality (FoodWatch, food permits, guide DM-HSD-GU70-PIGSA1 issue 5, Arabic); Federal Tax Authority; kattegat.app, checked 25 November 2026. Original illustrations.
Book the room, not the middleman.
Find venues, entertainers, and event teams on Kattegat — 0% commission on direct bookings.
Browse Kattegat
